Installation Guide

How to Install an Expandable Folding House

At Xiamen Sunfine Architect & Construction Co., Ltd., we don’t just sell expandable and folding container houses – we manufacture them.

With years of experience in modular housing production, Sunfine has helped hundreds of global clients successfully install expandable homes in countries such as Australia, New Zealand, and the USA.

This detailed step-by-step guide is written by our engineering and installation team, showing you how to unfold and install a Sunfine expandable folding house safely and efficiently.
Before we start, remember that every Sunfine house can be fully customized — from layout and color to insulation and fittings.
Click here to design your own expandable house →

Let’s begin with what makes a Sunfine folding house so easy to install.

Fully Customizable Expandable Houses

Every Sunfine house can be fully customized — from layout and color to insulation and fittings.


Design Your Own Expandable House →

Table of Contents

01. Product Introduction and Overview
02. Pre-Installation Precautions
03. Required Accessories
04. Required Tools & Machinery
05. Installation Steps & Methods

Product Introduction & Overview

The 20ft folding expandable house is engineered for fast deployment, convenient transportation, and efficient modular living. Its foldable structure allows quick installation while maintaining high structural strength and long-term durability.

Technical line drawings and blueprints of a 20ft folding expandable house by Sunfine, displaying the architectural design from the front view, rear view, left view, and right view.A detailed technical diagram labeling the structural parts of an expandable folding house, including the main roof, side roof, side large wall, side small wall, main bottom, and side base by Sunfine.

Pre-Installation Precautions & Safety Measures

Carefully Read the Installation Manual

Before starting installation, thoroughly read the installation manual and comply with local laws, regulations, industry standards, and labor protection guidelines.

Wear Personal Protective Equipment (PPE)

✔ Safety helmets
✔ Protective eyewear
✔ Protective clothing
✔ Non-slip insulated shoes
✔ Non-slip insulated gloves
✔ Dust masks or gas masks

Select an Appropriate Installation Site

Choose a solid and stable surface to place or install the product.

Loose, damp, uneven, or sloping ground
Areas prone to collapse
Near tall trees or high-voltage lines
Sites with flammable or corrosive substances

Prepare the site by:

 Removing weeds

Leveling, compacting, and hardening the ground

Ensuring proper drainage and moisture prevention to avoid ground collapse

Weather and Safety Considerations

In compliance with the Labor Law of the People’s Republic of China and Safety Regulations for High-Altitude Work, cease all work during severe weather conditions, including winds exceeding Level 4, rain, snow, heavy fog, or extreme heat.

Do not alter the structural framework of the product without authorization.

Required Accessories for Installation
(Note: The following list is for reference only. The actual components may vary based on the room configuration specified by the customer.)

Required Tools, Heavy Machinery, and Installation AssistanceA detailed manufacturing shipping list table for an expandable container house installation, showing accessories such as ceiling lights, structural adhesive, waterproof tape, locks, nails, and fixing brackets by Sunfine.

Due to the weight of the product, the installation process requires:

Crane: For lifting and positioning the product.

4-5 Personnel: To assist with installation tasks.

Tools Needed

Electric Drill (also known as a Hand Drill)

Phillips Drill Bit

An electric hand drill diagram alongside a set of four heavy-duty Phillips screwdriver bits required for securing panels during prefab expandable house assembly.

Installation Steps

Expandable House Installation Process

STEP 01

Unloading the Cargo

Before installation, remove all items from the shipping container.

STEP 02

Positioning the Product

Place the expandable house on a pre-prepared hardened surface and ensure the final location is confirmed before installation.


STEP 03

Side Fixed Panel Removal

Locate the side fixed panels, loosen the screws, and slide them outward to free the expandable structure.


STEP 04

Lift the Side Roof & Top Panel

Carefully raise the side roof and top panel, then secure them using support rods or a crane to prevent accidental movement.


STEP 05

Expand Walls & Floor Panels

Unlock the bottom latch, lower the floor panel, unfold the side large walls, and expand the front and rear small walls into their designated positions.


STEP 06

Secure Screws & Connection Points

Tighten all screw holes and fixing points on small walls, large walls, and roof sections using the specified screws and tools.


STEP 07

Waterproof Sealing Installation

Apply yellow sealing strips, structural adhesive, stainless steel panels, and waterproof tape to ensure reliable sealing and waterproof protection.


STEP 08

Install Electrical & Interior Components

Complete the installation of bedroom lights, door locks, sockets, lighting switches, and indoor ceiling brackets according to the provided instructions and wiring diagrams.

STEP 09

Unfold the Side Large Wall

Expand the side large wall to its full position.


STEP 10

Unfold the Rear Small Wall

Carefully expand the rear small wall into its designated position.


STEP 11

Unfold the Front Small Wall

Expand the front small wall and secure it in place.


STEP 12

Expand the Left Side of the House

Follow the same steps used for the right side to expand the left side of the house.


STEP 13

Screw Holes and Fixing Points

Small Walls

Screw holes are located at the top and bottom of the front and rear small walls.

Large Walls & Roof

Screw holes are present at designated positions on the left and right sides.

Tools & Screws

Use the screws and tools as indicated in the provided diagrams. Ensure all connections are securely fastened.


STEP 14

Installing Yellow Sealing Strips, Structural Adhesive & Stainless Steel Panels

Yellow Sealing Strips:

Cover the folding seams on the floor with the yellow sealing strips.

Structural Adhesive:

Apply structural adhesive along the installed yellow sealing strips.

Stainless Steel Panels:

Press and secure the stainless steel panels over the adhesive to finalize the floor.


STEP 15

Using Structural Adhesive & Waterproof Tape

Structural Adhesive

Apply adhesive at the junctions of the side base and side large walls to ensure proper sealing and waterproofing.

Waterproof Strips

Attach waterproof strips at the seams between the side roof and the main roof for enhanced waterproof sealing.


STEP 16

Bedroom Light Installation

Install bedroom lighting fixtures according to the provided instructions and ensure all connections are secure.


STEP 17

Bedroom Door Lock Installation

Mount and secure the door lock on the bedroom door according to the provided lock assembly instructions. Ensure proper alignment and functionality.


STEP 18

Socket & Lighting Switch Installation Guide

Based on Chinese National Standards. For non-standard configurations, this guide is for reference only.

Socket Installation Steps

  1. Dismantle the socket to access the installation panel.
  2. Locate the wiring holes at the back of the panel and connect the wires as shown in Diagram 2.
  3. Insert the installation panel into the socket box and secure it using installation screws.
  4. Attach the front panel by snapping it into place to complete the installation.


Lighting Switch Installation

  1. Disassemble the lighting switch to access the installation panel.
  2. Locate the wiring holes and wire the switch according to Diagram 2.
  3. Insert the installation panel into the back box after wiring.
  4. Secure the panel using installation screws.
  5. Attach the cover and front panel to complete the installation.

STEP 19

Indoor Ceiling Bracket Installation Instructions

Positioning the Indoor Bracket

Place the indoor bracket on the folding seam of the ceiling, ensuring the raised side is facing downward.

Fixing the Indoor Bracket

Use an electric drill and screws to securely attach the indoor bracket along the seam. Ensure the bracket is tightly fastened to prevent movement.

Contact Sunfine for Your Customizable Expandable House Solutions

At Sunfine, we specialize in designing and building expandable container houses and expandable homes tailored to your specific needs.

Whether you’re looking for a foldable house or a folding house that offers flexible and efficient housing solutions, we have the expertise and experience to deliver high-quality, durable products.

Recent Reviews

Angelica
I would love to know more about the expandable container for an exam project in Italy. Is there any technical manual or DWG files that I can check?
March 12, 2026 22:31

Ray Smith
I think I purchased one of your homes from a reseller here in the US. One shower door was broken. Can I purchase another one from you?
August 11, 2025 00:31

Joe Garza
Please send pricing.
July 09, 2025 12:28

Slimane MOUADH
Request for Technical Manual or Design Plans for Expandable Container Construction in Algeria.
June 11, 2025 10:56